D 2020

BIM within current building facilities and infrastructure

NÝVLT, Vladimír

Basic information

Original name

BIM within current building facilities and infrastructure

Authors

NÝVLT, Vladimír

Edition

Volume 972. Spojené království, IOP Conference Series: Materials Science and Engineering, p. Nestránkováno, 7 pp. 2020

Publisher

IOP Publishing Ltd

Other information

Language

English

Type of outcome

Proceedings paper

Field of Study

20101 Civil engineering

Country of publisher

United Kingdom of Great Britain and Northern Ireland

Confidentiality degree

is not subject to a state or trade secret

Publication form

electronic version available online

References:

Marked to be transferred to RIV

Yes

RIV identification code

RIV/75081431:_____/20:00002009

Organization unit

Institute of Technology and Business in České Budějovice

ISSN

Keywords in English

BIM; Building; information modeling; life cycle; management; information

Tags

Links

TL02000559, research and development project.
Changed: 25/6/2021 10:09, Mgr. Nikola Petříková

Abstract

In the original language

One of the main reasons for introducing BIM into existing buildings is cost savings in the construction management and maintenance phase (operating phase). Operational phases have the biggest impact on the total life cycle costs. The introduction of BIM and the creation of a building information model, albeit at a higher price, will be counterbalanced several times by a more efficient way of managing the building during its life cycle, the possibility of creating a healthier indoor environment for building users and better access to necessary information, for example in the case of changes to completed buildings. The BIM model is a digital equivalent of a real construction – real digital twin. It contains geometric data in the form of a 3D model and non-geometry data, including construction management and support documents. The BIM model allows access to building usage information. The information obtained is more accurate. It keeps building element information up to date, enabling more informed decisions. It supports comparison of different solutions and their energy needs. Renovation can be done more efficiently. Construction information is up-to-date, so we can use the time needed to process different solutions instead of finding the necessary information about the construction.

Files attached

Nyvlt_2020_IOP_Conf._souhrn.pdf
Request the author's version of the file