KRAUS, Michal, Petra BEDNÁŘOVÁ and Karel KUBEČKA. Risk Assessment of Airtightness of Building Envelope. Online. In Applied Mechanics and Materials. Vol. 824 (2016). Curych (Švýcarsko): Trans Tech Publications, 2016. p. 657-664. ISSN 1662-7482. Available from: https://dx.doi.org/10.4028/www.scientific.net/AMM.824.657. [citováno 2024-04-23]
Other formats:   BibTeX LaTeX RIS
Basic information
Original name Risk Assessment of Airtightness of Building Envelope
Name in Czech Hodnocení rizika vzduchotěsnosti obálky budovy
Authors KRAUS, Michal, Petra BEDNÁŘOVÁ and Karel KUBEČKA
Edition Vol. 824 (2016). Curych (Švýcarsko), Applied Mechanics and Materials, p. 657-664, 8 pp. 2016.
Publisher Trans Tech Publications
Other information
Original language English
Type of outcome Proceedings paper
Field of Study 20101 Civil engineering
Country of publisher Switzerland
Confidentiality degree is not subject to a state or trade secret
Publication form electronic version available online
Organization unit Institute of Technology and Business in České Budějovice
ISSN 1662-7482
Doi http://dx.doi.org/10.4028/www.scientific.net/AMM.824.657
Keywords (in Czech) Rizikový management; analýza rizika; hodnocení rizika; matice rizika; vzduchotěsnost
Keywords in English Risk management; risk analysis; risk assessment; risk assessment matrix; airtightness; air permeability; energy performance
Tags KST6
Changed by Changed by: Hana Dlouhá, učo 19800. Changed: 15/2/2017 10:48.
Abstract
The paper deals with risk analysis of insufficient airtightness of the envelope construction. The risk analysis is a systematic and structured data processing to identify potential hazards. The main aim of paper is to qualified risks which arise from the danger, i.e. insufficiently airtight of the building envelope. The quality of airtight building envelope except for low energy consumption also minimizes the risk of damage to the structure associated with the spread of the heat, water vapor in the structure and fungal growth. The qualification of risks consists of choice of method and determinative indicators, input data and simulation of model with drawing results.
Abstract (in Czech)
The paper deals with risk analysis of insufficient airtightness of the envelope construction. The risk analysis is a systematic and structured data processing to identify potential hazards. The main aim of paper is to qualified risks which arise from the danger, i.e. insufficiently airtight of the building envelope. The quality of airtight building envelope except for low energy consumption also minimizes the risk of damage to the structure associated with the spread of the heat, water vapor in the structure and fungal growth. The qualification of risks consists of choice of method and determinative indicators, input data and simulation of model with drawing results.
PrintDisplayed: 23/4/2024 21:21